GALWAY, IRELAND--September 22, 2014 --Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland) First power has been generated from the 1 billion ($1.3 billion) Westermost Rough offshore windfarm located eight kilometres (km) off the Yorkshire coast in the U.K..
The milestone comes just a month after the first Siemens' 6-megawatt (MW) turbine was installed.
(All Fields Required)