NEW DELHI--January 14, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--The Telangana government has unveiled an ambitious draft renewable energy policy targeting 51 gigawatts (GW) of renewable energy capacity by 2035. This includes 34 GW of solar energy (ground-mounted, rooftop and floating), 4.5 GW of wind, 2.5 GW from hydropower, and 10 GW from energy storage solutions such as battery and pumped-storage systems. The policy underlines efficient project timelines, with a two-year completion target post-allocation and provisions for penalty-backed extensions
(All Fields Required)