Marathon, on March 11, will start a 35-day planned maintenance turnaround of the 60,000-barrel-per-day (BBL/d) Crude 2 Unit, 104,000-BBL/d Fluid Catalytic Cracking Unit (FCCU) and 13,000-BBL/d Alkylation (Alky) Unit at its 261,000-BBL/d Los Angeles Carson Refinery in California.
(All Fields Required)