Marathon, on July 12, experienced issues with the attempted startup of the 140,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit 3 (FCCU) at its 437,000-BBL/d Galveston Bay Refinery in Texas City, Texas. Startup procedures are expected to resume by July 15. Separately, the 65,000-BBL/d Ultraformer 4 unit was shut down on July 11 for repairs, but restarted on July 12.
(All Fields Required)