Irving Oil continues to perform planned maintenance on the 25,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) 25 (Old) at its 300,000-BBL/d refinery in Saint John, New Brunswick.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.