PERTH, AUSTRALIA--December 12, 2013--Researched by Industrial Info Resources Australia (Perth, Australia)--Diamantina Power Station Pty Limited (DPS), a special purpose joint venture entity of APA Group (Brisbane, Australia) and AGL Limited (Victoria, Australia), is continuing with the construction of the 60-megawatt (MW) Leichhardt Open-Cycle Natural Gas Power Plant in Australia. The project has an estimated investment of $65 million.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!