EDF Completes Maintenance Shutdown at Gravelines Nuclear Reactor
DELHI--May 20, 2014--Researched by Industrial Info Resources India (Delhi, India)--French state-run power utility Electricite de France S A (EDF) (EPA: EDF) (Paris) has completed a 40-days maintenance shutdown at the first 900-megawatt (MW) reactor unit
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.