July 8, 2024--Written by Amir Richani for Industrial Info Resources (Sugar Land, Texas)--On July 3, Eramet (Paris, France) inaugurated its Centenario Phase 1 lithium extraction plant in Salta, Argentina. The plant is designed to produce 24,000 tons per year of battery-grade lithium carbonate at full capacity, and it is expected to start operations by November.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!