Basin Electric Power Cooperative has moved up the restart of the 570-megawatt (MW) Laramie River 01 unit at its Laramie River Power Station in Wyoming. The restart now is scheduled for August 18. Separately, the Laramie River 02 unit was shut down on August 12 to repair a boiler tube leak. The restart is expected August 19.
(All Fields Required)