Deer Park Refining, on July 19, restarted the 67,000-barrel-per-day (BBL/d) SHCU (Hydrocracker) and 70,000-BBL/d Fluid Catalytic Cracking Unit (FCCU) at its 340,000-BBL/d refinery in Deer Park, Texas, after shutting them down on July 16.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.