GALWAY, IRELAND--July 5, 2021--Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland)--The largest battery energy storage system (BESS) in Europe will be installed at the Olkiluoto nuclear power plant in Finland following a deal between plant owner and operator Teollisuuden Voima Oyj (TVO) and Hitachi ABB Power Grids (Zurich, Switzerland). Within this article: Details battery storage project, scale, timelines, new nuclear plant, related European battery storage projects
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!