NextEra Energy Seabrook LLC's 1,244-megawatt (MW) Seabrook 01 unit at its Seabrook Nuclear Power Station in New Hampshire is operating at 21% as it ramps up from a refueling outage.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.