Associated Electric Cooperative Incorporated's coal-fired, 670-megawatt (MW) Thomas Hill 03 unit was forced offline to repair a boiler at its Thomas Hill Energy Center in Missouri. The event is expected to end November 3.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.