Entergy Louisiana LLC's 1,176-megawatt (MW) Waterford 03 steam turbine unit is offline for a refueling and generator rewind at its Waterford Three Nuclear Power Station in Louisiana. The event is expected to end January 12.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.