Flint Hills, on March 13, shut down the 58,000-barrel-per-day (BBL/d) Continuous Catalytic Reformer in the West Complex of its 300,000-BBL/d refinery in Corpus Christi, Texas, due to a leak. The cause and shutdown duration are unknown at this time, and the company is investigating any required repairs.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!