Marathon Petroleum, on April 4, will begin 35 days of planned maintenance on the 20,000-barrel-per-day (BBL/d) Diesel Hydrotreater (ULSD) and 20,000-BBL/d Gasoline Hydrotreater (GHT) at its 92,000-BBL/d refinery in Canton, Ohio.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.