BP continues with a 35-day planned maintenance turnaround of the 55,000-barrel-per-day (BBL/d) Hydrocracker and 50,000-BBL/d Reformer 1 at its 250,000-BBL/d Cherry Point Refinery in Washington. The turnaround began April 5.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.