Valero, on April 28, was forced to shut down its 135,000-barrel-per-day (BBL/d) refinery in Meraux, Louisiana, after experiencing a power outage. Plant personnel hope to have the facility back online within the next 24 to 48 hours.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.