ExxonMobil continues with a planned maintenance turnaround of the 314,000-barrel-per-day (BBL/d) Crude Pipe Still 8 at its 557,000-BBL/d refinery in Baytown, Texas.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.