Marathon, on October 31, was forced to shut down the 56,000-barrel-per-day (BBL/d) Crude 6 and 40,000-BBL/d Vacuum Distillation Unit (VDU) on the north side of its 120,000-BBL/d refinery in El Paso, Texas. At this time, plant personnel have not indicated a restart timeline.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!