HF Sinclair, on March 1, will start 45 days of maintenance on the 50,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) and 4,000-BBL/d SF Alkylation (SF Alky) 1 Unit and associated units at its 144,000-BBL/d Puget Sound Refinery in Anacortes, Washington.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!