Valero, on February 23, shut down the 77,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit (FCCU) at its 144,000-BBL/d refinery in Benicia, California due to operational issues. The shutdown is expected to advance plans for a previously reported turnaround scheduled for September 2025.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!