Valero, on February 23, shut down the 77,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit (FCCU) at its 144,000-BBL/d refinery in Benicia, California due to operational issues. The shutdown is expected to advance plans for a previously reported turnaround scheduled for September 2025.
(All Fields Required)