METRO MANILA--September 27, 2024--Researched by Industrial Info Resources (Sugar Land, Texas)--Woodside Energy Group (Perth, Australia) has decided to halt two of its major green hydrogen projects in Australia and New Zealand totaling around 2.3 gigawatts (GW) of electrolyzer capacity.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!