January 16, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--Bill Gates' TerraPower (Bellevue, Washington) this week received permission from a state agency to begin construction on the non-nuclear portions of a proposed small commercial nuclear power plant near Kemmerer, Wyoming. With the application for the advanced-model reactor in front of the U.S. Nuclear Regulatory Commission (NRC), the site has the potential to host the U.S.' newest nuclear power plant.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!