Phillips 66 on June 28, will shut down the 43,000-BBL/d Gas Oil Hydrodesulfurization (GOHDS) Unit 41, for four to seven days of repairs, at its 145,000-BBL/d Borger, Texas, refinery.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.