MANILA, PHILIPPINES--November 18, 2013--Researched by Industrial Info Resources (Sugar Land, Texas)--A capacity shortage at state-owned power producer Sarawak Energy Berhad (Kuching, Malaysia) could delay 10 smelter expansion projects in the Samalaju Industrial Park, in Malaysia's Sarawak Corridor of Renewable Energy (SCORE).
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!