ExxonMobil, on July 10, shut down the 80,000-barrel-per-day (BBL/d) PTR 4 Continuous Catalytic Reformer (CCR) Unit at its 360,000-BBL/d refinery in Beaumont, Texas, for unknown reasons. The outage duration is unknown at this time.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.