Phillips 66 plans to restart two units at its 146,000-barrel-per-day (BBL/d) refinery in Borger, Texas in December: the 30,000-BBL/d Fluid Catalytic Cracker Unit (FCCU) 40 will restart in the first week of the month and the 30,000-BBL/d FCCU 29 will restart around mid-December.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!