Join us on April 30th for our 2025 Global Food & Beverage Project Spending Outlook! RSVP Today!
Sales & Support: +1 800 762 3361
Member Resources
Today

Phillips 66, on June 11, shut down the 14,000-barrel-per-day (BBL/d) Hydrofluoric Alkylation (HF alky) Unit at its 146,000-BBL/d refinery in Borger, Texas, as issues have continued with the 78,000-BBL/d Gas Oil Hydrodesulfurizer Unit 42 since May 17. The latter unit is running at a reduced rate, possibly until June 17. The 41,000-BBL/d Crude Unit 9, 37,000-BBL/d Crude 10 and 68,000-BBL/d Crude 28 are running at minimum rates, and the 30,000-BBL/d Fluid Catalytic Cracker Unit (FCCU) 40 if offline, until the gas oil unit returns to normal rates.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

All Members Receive the Vlauable Resources

All Members Receive the Following Resources:

  • Industry News Digest
  • Upcoming Podcasts
  • On-Demand Podcasts
  • The NavigatIIR Newsletter
  • Economic Indicators
View All Member Resources
IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×
×
Contact Us

For More Info!